Last updated: 08/31/97
Mission Sequence Planner: Art Thompson
Rover Driver: Brain (Speedie) Cooper
| SCET | LST | ||
|---|---|---|---|
| Nominal sequence activation time: | 244 14:26 | Sol 58 10:42 | |
| Nominal sequence abort time: | 247 15:08 | Sol 61 09:30 | (during command [8383]) |
Previous sequence 55610 will nominally be aborted at command [6175]
** Vehicle positions are in surface-fixed frame
Sol 58 Downlink (by APID) Predicted telemetry volume generated between activation of sequence 55810A from
nominal start to nominal abort.
See notes to rover team above.
Web Page Author: Art (Just don't call me) Thompson
All information on this site, including text and images describing the
Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.
MISSION SEQUENCE PLANNER REPORT
Notes to Rover Team:
SEQUENCE DESCRIPTION
X Position (m) Y Position (m) Heading (deg)
At Sequence Start** -4.942 -3.876 89.07
At End of Sol 59* (predicted) -4.624 -4.065 129.00
* at completion of planned SOL's traverse activities assuming nominal execution
Image Type X (m) Y (m) Z (m)
S0055 -2.525 -1.725 -0.30
S0055 -2.081 -2.294 -0.30
S0055 -13.668 -8.546 -0.30
S0055 -11.404 11.447 -0.30
SEQUENCE IMPLEMENTATION REPORT
SCIENCE/TECHNOLOGY OBJECTIVES REPORT
Rover Imaging
APXS Experiments
Technology Experiments
Rover
APXS Experiments
Technology Experiments