PRELIMINARY REPORT: Loaded Sequence


Contingency Mission Load

EXTENDED PHASE
SOL 92 ROVER SEQUENCE PLANNING REPORT


Last updated: 2 October 1997
Mission Sequence Planner: AHM




IF NO NEW SEQUENCE IS UPLOADED TO THE ROVER, THE CONTINGENCY SEQUENCE WILL BE TRIGGERED ~10:00 LST ON SOL92:




MISSION SEQUENCE PLANNER REPORT




SEQUENCE DESCRIPTION


  • Vehicle Positions:

    X Position (m)Y Position (m)Heading (deg)
    At Sequence Start** -8.686 -2.103 63
    At Sequence End* ?? ?? ??

    ** Vehicle positions are in surface fixed coordinate frame

    * Rover should be in the vicinity of the lander, within ~3 meters

  • Telemetry Volume Estimates



    SEQUENCE IMPLEMENTATION REPORT