FLIGHT
SOL 3 END-OF-DAY DOWNLINK STATUS REPORT


Last updated: 7 July 1997, 05:00 am PST, Data Controller: Henry W. Stone and Allen R. Sirota

Summary Report
Retransmit Requests
Sequence Planning Recommendations & Constraints
Sequence Execution Status
Telemetry Volume
Traverse Hazards (Detected)
Subsystem Reports
Telemetry Processing Anomalies
Press Release



SUMMARY REPORT


Wakeup:

  • Sequence 50250V:
  • Sequence 50310C:

  • IMP Imaging:



    RETRANSMIT REQUESTS




    SEQUENCE PLANNING RECOMMENATIONS
    1. Disable Auto Shutdown until point of "end of nominal sequence execution"
    2. Set modem heating to 5 minutes
    3. Set modem reheating to 5 minutes
    4. Retake "Laser Engineering Images" (Image request form to be submitted).
    5. Clear errors prior to turning on lasers for "Laser Engineering Images"
    6. Re-execute Set Parameter (ADM_DLIM = -100) previously skipped.
    7. Perform Level 2 Health Checks every hour during the night to acquire thermal profile data previously lost/missed.
    8. Mask contact sensors prior to retraction of ADM (just a reminder).
    1. Read persistent state table at approximately 14:00 LST every Sol so that we get its most recent state just prior to the end of the afternoon downlink.


    SEQUENCE EXECUTION STATUS & VEHICLE STATE

    SEQUENCE EXECUTION STATUS:


    VEHICLE STATE:

    BATTERY STATE/USAGE


    SUBSYSTEM STATUS:



    TRAVERSE HAZARDS (DETECTED)




    TELEMETRY VOLUME


    TELEMETRY VOLUME SUMMARY:



    SUBSYSTEM REPORTS


    NAVIGATION PERFORMANCE:

    THERMAL PERFORMANCE:

    COMMUNICATIONS PERFORMANCE:

    MOBILITY PERFORMANCE:

    POWER PERFORMANCE:



    TELEMETRY PROCESSING ANOMALIES


    PRESS RELEASE


    Web Page Authors: Henry W. Stone and Allen.R.Sirota

    All information on this site, including text and images describing the Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.