SUMMARY REPORT


Downlink:

Sequence 51410C:

Sequence 51510B:

Sequence 51710B:

Sequence 51810D:

RETRANSMIT REQUESTS




SEQUENCE PLANNING RECOMMENDATIONS
Proceed with nominal sequence planning Operational Constraints (Sol 19 Sequence):
  1. Disable auto shutdown
  2. Set Modem Heat to 15 minutes; 10 minutes if following a night-time APXS)
  3. Set Modem Reheat to 5 minutes.
  4. Set alarm based wakeup on morning of Sol 19 for 08:00 LST
  5. Perform Read Memory just before last downlink session
  6. Leave X accelerometer ENABLED
  7. ENABLE Y accelerometer for long moves and waypoints, DISABLE for short, simple moves/turns.
  8. DISABLE Z accelerometer.
  9. Make sure to terminate heating at 15:00, not 15:30!
  10. Use Web_Heat_B parameter instead of Web_Heat_A.
  11. Always command a Level 2 Health Check before shutdown.
Engineering Requests:
  1. Take pre and post S0050 images at Low-Compression (3:1).
  2. (DESIRE) Take rover images as early in the morning as possible to reduce dark noise current.
  3. (DESIRE) Leave rover on until 15:45 LST to collect late afternoon thermal data, perform health check just before shutdown.
Operational Constraints (General):
  1. Perform level 2 health check at the end of every traverse command
  2. Perform Time Sync just prior to EOD shudown.
  3. Limit image transfer after 1:00 LST (to prevent overheating)
  4. Limit each "Move Command" distance to 1 meter or less to enable gyro to be recalibrated and thereby reduce the amount of drift.
  5. Insert longer wait (10 seconds) between APXS cycle start command and APXS turn-off command (turn off devices)
  6. Perform WEB heating on days of low activity (i.e. no traverses) from 12:00 (noon) to 15:00 MLST with temperature setting at 30 deg and if not performing night-time APXS (should be in runout sequences)
  7. Future soil mechanics experiments in suspected hard material should have 6 spins of 500 counts rather than 4.


SEQUENCE EXECUTION STATUS & VEHICLE STATE

SEQUENCE EXECUTION STATUS:


VEHICLE STATE: (AS OF COMMAND: 0, Auto Health Check (After command 18106) SCET: 7/22/97 14:17 )


BATTERY STATE/USAGE



SUBSYSTEM STATUS:



TRAVERSE HAZARDS (DETECTED)




TELEMETRY VOLUME




SUBSYSTEM REPORTS


NAVIGATION PERFORMANCE:

THERMAL PERFORMANCE:

COMMUNICATIONS PERFORMANCE:

MOBILITY PERFORMANCE:

POWER PERFORMANCE:



TELEMETRY PROCESSING ANOMALIES


PRESS RELEASE

Today the Sojourner left the vicinity of Scooby-Doo travelling approximately 2 meters to the west. A soil experiment was performed at the end of the traverse and images of the site from the rover were successfully received.