Last updated: 23 Aug 1997, 05:45 PDT, Data Controller: Allen R. Sirota
Retransmit Status:
Modify sequence for Sol 51
Operational Constraints (for Sol 51 Sequence):
SEQUENCE EXECUTION STATUS (AS OF EOD SOL 49):
VEHICLE STATE(AS OF EOD SOL 49):
(AS OF COMMAND: 0 (Auto Health Check after command 49101)
BATTERY STATE/USAGE(AS OF EOD SOL 49 .. NOT Sol 50) - Covers Sols 45-49
SUBSYSTEM STATUS (AS OF EOD SOL 49):
NAVIGATION PERFORMANCE:
Patch to disable articulation hazard monitoring at level2. Capture images of
lander. Disable bogeys, gyro then drive off Wedge toward Shark.
The rover successfully completed all the traversal commands for the
day. All the move command data were lost due DSN transmission problem.
The z accel continued to show anomalous readings, while the y accel
was not showed anomalous readings. All today navigation commands
were run at risk level 2 (no articulation hazard involved(new patch))
and the gyro was disable and the odometry was used for the
turn-in-place instead.
CONSTRAINTS:
THERMAL PERFORMANCE:
TELECOM PERFORMANCE
MOBILITY PERFORMANCE:
Based upon the data returned in the health checks returned for SOL 47, 48, & 49,
the Power Subsystem is in good health with no operational problems noted.
It has been noted, however, that the MAE open and closed readings are not enough
different that it is providing good data. It is believed that the MAE movable
cover glass is not being moved enough to uncover the short circuit cell
completely.
POWER PERFORMANCE:
TBD
Web Page Authors: Henry W. Stone and
Allen.R.Sirota All information on this site, including text and images describing the
Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.
SUMMARY REPORT
Sequence 54710B:
Sequence 54910B:
RETRANSMIT REQUESTS
SEQUENCE PLANNING RECOMMENDATIONS
Engineering Requests:
Operational Constraints (General):
SEQUENCE EXECUTION STATUS & VEHICLE STATE
Execution: Nominal
State: Nominal, looking at Shark
Wakeup: Alarm Clock, 8:21 MLST
Crit Errors: None
Executing runout of sequence 54910B
SCET: 8/23/97 11:36, MLST: Sol 49 13:48
)
Mission Phase: Primary (assumed)
Mode: Executing
Config: Nominal (off of wedge)
Power: Nominal
Device Status: Nominal, with gyro, Z accel, and RFW temp. sensor disabled
MAE data degraded as it appears cover is not opening fully
Temp (Internal): Nominal
Temp (External): Nominal
Temp:(Modem): Nominal
Parameter Initial Final IMP EOD Parameter Initial Final
---------------------------------------------------------------------------------
X Position (m) -4.134 -5.321 ? LBogey (deg) +4.40 +15.60
Y Position (m) -2.019 -2.957 ? RBogey (deg) +3.92 +0.56
Heading (deg) 209.0 52.7 ? Diff (deg) -10.48 -0.80
Pitch (deg) +4.7 +4.7 (+ Pitch -> Front down)
Roll (deg) -13.1 -10.7 (+ Roll -> Roll to Starboard)
ADM Pos (deg) -1.28 -1.28 (Fully retracted)
LFS (deg) -42.2 +1.9 RFS (deg) +42.9 -0.6
LRS (deg) +48.0 +0.0 RRS (deg) -48.6 -1.9
--------------------------------------------------------------------------------
Total Battery Remaining (Amp*hrs)
Category Allocation Initial Final *Predicted
--------------------------------------------------------------
Operations 10 3.285 2.846 2.746
Science 10 4.880 4.880 4.880
Technology 10 7.280 7.280 7.280
--------------------------------------------------------------
Total 30 15.445 15.006 14.906
* at completion of sequence 54910B.
ADM Bumper Solar
UL UR B RB LB LR RR RF LF
Mask 1 1 1 1 1 1 1 1 1
State 0 0 0 0 0 0 0 0 0
ERROR FLAGS
Skip GenFail InvalidCmd WEB_Hot NoPwr NonTrav DevNA DevFail Timeout
Mask 1 1 1 1 1 1 1 1 1
State 0 0 0 0 0 0 0 0 0
S/S Status Comments
C&N Nominal None
MTM Nominal None
Thermal Nominal None
Power Nominal MAE data appears unusable
Telecom Nominal None
TRAVERSE HAZARDS (DETECTED)
49060 turn_by (-4792,-2272) 8CED: AY0
49060 turn_by (-4792,-2272) 8F91: AY0
49060 turn_by (-4792,-2272) 9210: AY0
49060 turn_by (-4792,-2272) 950A: AZ1
49060 turn_by (-4792,-2272) 97F6: AZ1
49060 turn_by (-4792,-2272) 9A6E: AX0 AZ1
49060 turn_by (-4792,-2272) 9D68: AX0
49060 turn_by (-4792,-2272) A005: AX0 AZ1
49060 turn_by (-4792,-2272) A307: AZ1
49060 turn_by (-4792,-2272) A5B9: AX0
49091 turn_by (-5321,-2957) A072: AX0 AZ2
49091 turn_by (-5321,-2957) 981A: AZ1
49091 turn_by (-5321,-2957) 9584: AY1 AZ2
49091 turn_by (-5321,-2957) 9290: AY0 AZ1
49091 turn_by (-5321,-2957) 902D: AY0
49091 turn_by (-5321,-2957) 8D41: AZ1
49091 turn_by (-5321,-2957) 81F7: AY0 AZ1
49091 turn_by (-5321,-2957) 63AE: AZ2
49091 turn_by (-5321,-2957) 60BA: AZ1
49091 turn_by (-5321,-2957) 5E24: AZ1
49091 turn_by (-5321,-2957) 5854: AZ1
49091 turn_by (-5321,-2957) 5069: AZ1
49091 turn_by (-5321,-2957) 4D67: AZ1
49091 turn_by (-5321,-2957) 34F7: AZ1
49091 turn_by (-5321,-2957) 2F2F: AZ1
49091 turn_by (-5321,-2957) 2CA0: AX0 AZ1
49092 move (-5321,-2957) 257D: AY0 AZ1
TELEMETRY VOLUME
DATA VOLUME SUMMARY (BY APID)
APID #PKTS #BYTES #Mbits
----------------------------------
4 23 6735 0.05388
5 99 4395 0.03516
6 2 120 0.00096
7 0 0 0.00000
8 154 282456 2.25965
9 0 0 0.00000
10 0 0 0.00000
12 0 0 0.00000
23 0 0 0.00000
24 0 0 0.00000
25 0 0 0.00000
29 3 2314 0.01851
----------------------------------
281 296020 2.36816
*All data downlinked on this Sol INCLUDING retransmitted data.
SUBSYSTEM REPORTS
ACTIVITIES:
Pending
Pending
OL 45 to 49 Rover Power Subsystem Downlink Report
Based upon the data returned in the health checks returned for SOL 47, 48, & 49,
the Power Subsystem is in good health with no operational problems noted.
It has been noted, however, that the MAE open and closed readings are not enough
different that it is providing good data. It is believed that the MAE movable
cover glass is not being moved enough to uncover the short circuit cell
completely.
TELEMETRY PROCESSING ANOMALIES
PRESS RELEASE