Final Flight Scenario
50910B, Sol 9 scenario, 7/12/97

Assumptions:

Assume runout of 50820A on SOL 8, all rover systems healthy except Y accel.

Due to concerns that operation of the LMRE modem may play a role in causing lander resets, the rover is being loaded with a safing sequence designed to keep it safe until the problem has been diagnosed and SOLved.


50910B Rover Activities:


Last Updated: 7/12/97