Rover Scenario
Sequence 54510, Sol 45 scenario, 8/18/97

Assumptions:

Assume nominal completion of sequence 54310 on morning SOL SOL 45, rover systems healthy except for failed right front wheel temperature sensors and continued noise on accels.

Try to escape gravity well of Wedge (what kinda material is it made of anyway?)


LMRE will be powered ON at: 07:38 LST
Queue rover load 54510 at: 09:31 LST
IMP sequence S0055, (not used) at: 10:03 LST
IMP sequence S0056, rover EOD image at: 10:23 LST
LMRE powered OFF at: 10:24 LST
Downlink ends at: 10:54 LST


54510 Rover Activities:
Time (LST) Activity Telemetry Estimate(Mbits)
~07:15 Wakeup
09:31 Abort sequence 54310
09:45 Get off Wedge and move toward Shark
10:23 S0056 used as EOD imaging (8 stereo pairs) 2.0
12:00 MAE experiment
14:00 MAE experiments
15:45 Shutdown
Sol 46 ~07:45 Wakeup, no uplink/downlink today (LMRE off)
Sol 46 12:00 MAE experiment
Sol 46 15:45 Shutdown
Sol 47 ~07:45 Wakeup, await new sequence
total telemetry volume ~2.5 Mbits


Last Updated: 8/18/97