Rover Scenario
Sequence 55310D, Sol 53 scenario, 8/26/97

Assumptions:

Assume sequence 55210 completed. Rover has APXS placed against the rock called Shark. All rover systems healthy except for failed right front wheel temperature sensors, continued noise on accels, and a flaky gyro.

Plan:

Attempt to APXS Halfdome, by backing up while groping with our APXS for contact

Run sans gyro to give odometers their big chance

If contact is made, perform APXS night operations


LMRE will be powered ON at: 07:38 LST
Queue rover load 55310 at: 09:31 LST
IMP sequence S0050 (movie) at: 10:00 LST <
IMP sequence S0055 at: 10:45 LST
LMRE powered OFF at: 11:05 LST
Downlink ends at: 11:35 LST


55310 Rover Activities:
Time (LST) Activity Telemetry Estimate(Mbits)
~07:15 Wakeup
09:31 Abort sequence 55210
09:45 Move forward to get APXS off Halfdome, then retract APXS
09:51 WAE experiment
09:56 Wait for S50 rover movie
10:01 Drive forward, turn, and backup to Halfdome
10:15 Rear image of APXS deployed on Halfdome
12:00 MAE experiment
14:00 MAE experiment
14:04 Begin night APXS operations
15:45 Shutdown
Sol 53 ~07:45 Wakeup, await new sequence
total telemetry volume ~1.3 Mbits


Last Updated: 8/26/97