Rover Scenario
Sequence 55410C, Sol 54 scenario, 8/27/97

/mpf/FDB/dev/SPACECRAFT_ACTIVITY_SEQUENCE/surface

ROV_55410C_RASF
ROV_55410C_RAIF


Assumptions:

Assume sequence 55310 completed. Rover near Half Dome with APXS partly deployed but not in contact. All rover systems healthy except for failed right front wheel temperature sensors, continued noise on accels, and a flaky gyro.

Plan:

Attempt to APXS Halfdome, by turning 40 degrees to left, then fully deploying the ADM

Run sans gyro to give odometers their big chance

If contact is made, perform APXS night operations


LMRE will be powered ON at: 07:38 LST
Queue rover load 55410 at: 12:11 LST
IMP sequence S0050 (movie) at: NA <
IMP sequence S0055 at: 12:49 LST
LMRE powered OFF at: 13:09 LST
Downlink ends at: 13:39 LST


55410 Rover Activities:
Time (LST) Activity Telemetry Estimate(Mbits)
~07:15 Wakeup
12:11 Abort sequence 55310
10:01 Turn 40 degrees to the right
10:01 Deploy APXS to Halfdome
10:15 Rear image of APXS deployed on Halfdome
14:00 MAE experiment
14:04 Begin night APXS operations
15:45 Shutdown
Sol 55 ~07:45 Wakeup, await new sequence
total telemetry volume ~1.0 Mbits


Last Updated: 8/27/97