Last updated: 09/02/97
Mission Sequence Planner: Andrew Mishkin
Rover Driver: Rick Welch
| SCET | LST | ||
|---|---|---|---|
| Nominal sequence activation time: | 246 17:30 | Sol 60 12:30 | |
| Nominal sequence abort time: | 248 19:15 | Sol 62 12:45 | (during command [10095]) |
Previous sequence 55810 will nominally be aborted at command [8???]
** Vehicle positions are in surface-fixed frame
Sol 60 Downlink (by APID) Predicted telemetry volume generated between activation of sequence 56010B from
nominal start to nominal abort.
See notes to rover team above.
TBD
Summary of Planned Rover Activities for Sol 60:
Web Page Author: Andrew Mishkin
All information on this site, including text and images describing the
Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.
MISSION SEQUENCE PLANNER REPORT
Notes to Rover Team:
SEQUENCE DESCRIPTION
X Position (m) Y Position (m) Heading (deg)
At Sequence Start** -4.942 -3.876 89.07
At End of Sol 60* (predicted) -4.942 -3.876 89.07
* at completion of planned SOL's traverse activities assuming nominal execution
Image Type X (m) Y (m) Z (m)
S0055 -2.525 -1.725 -0.30
S0055 -2.081 -2.294 -0.30
S0055 -13.668 -8.546 -0.30
S0055 -11.404 11.447 -0.30
APID Name Predicted
#PktsPredicted
#Mbits
4 Health Status 37 0.08614
5 Ops/Engr 56 0.02603
6 Sequence Status 5 0.00142
7 Error Reports 0 0.00000
8 Science Imaging 0 0.00000
9 Technology Imaging 0 0.00000
10 Lander Imaging 0 0.00000
12 APXS Results 0 0.00000
23 Priority Ops/Engr. 0 0.00000
24 Auto Imaging 0 0.00000
25 Ops Imaging 0 0.00000
29 Traverse Reporting 0 0.00000
TOTAL 98 0.11358
SEQUENCE IMPLEMENTATION REPORT
SCIENCE/TECHNOLOGY OBJECTIVES REPORT
Rover Imaging
APXS Experiments
Technology Experiments
Rover
APXS Experiments
Technology Experiments
Image Log # Status Command Image Type APID Camera Exposure Compression Rows Columns
APXS Log # Status Time (UTC) Command # APXS Command
MAE Log # Status Time (UTC) Command # MAE Command
ACCEPTED 246 17:38:49 [10028] Set Parameter: dust_cvr to 800
ACCEPTED 246 17:38:53 [10029] MAE Experiment
ACCEPTED 247 17:45:17 [10062] Set Parameter: dust_cvr to 800
ACCEPTED 247 17:45:21 [10063] MAE Experiment
ACCEPTED 248 18:24:52 [10091] Set Parameter: dust_cvr to 800
ACCEPTED 248 18:24:56 [10092] MAE Experiment
WAE Log # Status Time (UTC) Command # WAE Command
Soil Log # Status Time (UTC) Command # Soil Mechanics Command
PRESS RELEASE
Description of Planned Rover Operations for Sol 60:
PDT MLST Rover Acivity 10:36 12:31 Sequence 56010 MARS
10:36 12:31 Begin Daytime Ops Prep
10:36 12:31 Do not EVER change the
10:36 12:31 Never change the following
10:37 12:31 No ops day
10:38 12:33 Read persistent state table
10:38 12:33 End Daytime Ops Prep
10:38 12:33 Begin MAE experiment
10:38 12:33 WARNING: Confirm dust cover para
10:39 12:34 End MAE experiment
11:06 12:59 Begin EOD Ops Prep
11:07 13:01 Read persistent state table
11:07 13:01 Afternoon WEB heat
11:07 13:01 End of EOD Ops Prep
06:07 07:31 No ops day
08:41 10:01 Begin Daytime Ops Prep
08:43 10:02 Read persistent state table
08:43 10:02 End Daytime Ops Prep
10:45 12:01 Begin MAE experiment
10:45 12:01 WARNING: Confirm dust cover para
10:46 12:02 End MAE experiment
11:46 13:01 Afternoon WEB heat
12:33 13:46 LMRE off 13:23 LST
06:47 07:31 No ops day
09:21 10:01 Begin Daytime Ops Prep
09:22 10:02 Read persistent state table
09:22 10:02 End Daytime Ops Prep
11:24 12:01 Begin MAE experiment
11:24 12:01 WARNING: Confirm dust cover para
11:25 12:02 End MAE experiment
12:26 13:01 End of Nominal Execution