Assumptions:

Rover is healthy, and has executed SOL75 sequence 57510 until nominal end of sequence.

Plan:

Sol 76 Activities Time (LST)
LMRE will be powered ON at: 07:38
Queue rover load 50110 at: 09:37
Rover movie, S0050: 10:30 (NA)
Soil mech image, S0053: 10:50 (NA)
Soil mech image, S0054: 11:10 (NA)
EOD image, S0055: 11:00 (NA)
Rover tracks image, S0056: 11:30 (substitute S0055)
LMRE off: 11:25
Downlink Ends 12:00
Sol 77
LMRE will be powered ON at: 07:38
Queue rover load 57710 at: 09:31
LMRE off: 10:42
Downlink Ends 11:17