Rover is healthy, and has executed SOL75 sequence 57510 until nominal end of sequence.
Plan:
| Sol 76 Activities | Time (LST) |
|---|---|
| LMRE will be powered ON at: | 07:38 |
| Queue rover load 50110 at: | 09:37 |
| Rover movie, S0050: | 10:30 (NA) |
| Soil mech image, S0053: | 10:50 (NA) |
| Soil mech image, S0054: | 11:10 (NA) |
| EOD image, S0055: | 11:00 (NA) |
| Rover tracks image, S0056: | 11:30 (substitute S0055) |
| LMRE off: | 11:25 |
| Downlink Ends | 12:00 |
| Sol 77 | |
| LMRE will be powered ON at: | 07:38 |
| Queue rover load 57710 at: | 09:31 |
| LMRE off: | 10:42 |
| Downlink Ends | 11:17 |