Plan:
| Sol 01 Activities | Time (LST) |
|---|---|
| LMRE will be powered ON at: | |
| Queue rover load 50110 at: | |
| Rover movie, S0050: | |
| Soil mech image, S0053: | |
| Soil mech image, S0054: | |
| EOD image, S0055: | |
| Rover tracks image, S0056: | |
| LMRE off: | |
| Downlink Ends | |
| Sol xx | |
| LMRE will be powered ON at: | |
| Queue rover load 50110 at: | |
| LMRE off: | |
| Downlink Ends |