Rover Scenario
Sequence 50110, Sol 01 scenario

Assumptions:

Plan:

Sol 01 Activities Time (LST)
LMRE will be powered ON at:
Queue rover load 50110 at:
Rover movie, S0050:
Soil mech image, S0053:
Soil mech image, S0054:
EOD image, S0055:
Rover tracks image, S0056:
LMRE off:
Downlink Ends
Sol xx
LMRE will be powered ON at:
Queue rover load 50110 at:
LMRE off:
Downlink Ends


Last Updated: