Mission Sequence Planner: Andy Mishkin/Art Thompson
Rover Driver: Brian Cooper/Jack Morrison
| SCET | LST | ||
|---|---|---|---|
| Nominal sequence activation time: | 272-08:07 | SOL85-10:34 | |
| Nominal sequence abort time: | 275-09:56 | SOL88-10:34 | (during command [35358]) |
Previous sequence 58110B will nominally be aborted at command [31251]
MISSION SEQUENCE PLANNER REPORT
SEQUENCE DESCRIPTION
Plan:
| Sol 85 Activities | Time (LST) |
|---|---|
| LMRE will be powered ON at: | 08:03 |
| Queue rover load 58510 at: | 10:34 |
| Rover movie, S0050: | 10:25 (NA) |
| Soil mech image, S0053: | 10:45 |
| Soil mech image, S0054: | 11:05 (NA) |
| EOD image, S0055: | 13:22 |
| Rover tracks image, S0056: | 13:50 (NA) |
| LMRE off: | 13:50 |
| Downlink Ends | 14:28 |
| Sol 86 | |
| LMRE will be powered ON at: | 08:03 |
| Queue rover load 58610 at: | NO UPLINK |
| LMRE off: | 13:55 |
| Downlink Ends | 14:11 |
| Sol 87 | |
| LMRE will be powered ON at: | 08:03 |
| Queue rover load 58710 at: | NO UPLINK |
| LMRE off: | 13:55 |
| Downlink Ends | 14:27 |
| Sol 88 | |
| LMRE will be powered ON at: | 08:10 |
| Queue rover load 58810 at: | NO UPLINK |
| LMRE off: | 14:00 |
| Downlink Ends | 14:30 |
| X Position (m) | Y Position (m) | Heading (deg) | |
|---|---|---|---|
| At Sequence Start** | -8.686 | -2.103 | 63 |
| At End of Sol 85* (predicted) | -5.852 | 4.290 | ?? |
** Vehicle positions are in surface-fixed frame
* at completion of planned SOL's traverse activities assuming nominal execution
| Image Type | X (m) | Y (m) | Z (m) | Imaging Opportunity |
|---|---|---|---|---|
| Sol 85 End-of-Day Ops | -18.200 | 5.440 | 0.386 | |
| Sol 85 End-of-Day Ops | -18.966 | 1.162 | 0.386 | |
| Sol 85 End-of-Day Ops | -18.750 | -3.179 | 0.386 | |
| Sol 85 S0053 Soil Mechanics | -19.100 | -4.325 | 0.386 | |
| Sol 86 End-of-Day Ops | -1.360 | 5.900 | 0.282 | |
| Sol 86 End-of-Day Ops | -2.661 | 5.398 | 0.282 | |
| Sol 86 End-of-Day Ops | -3.816 | 4.616 | 0.282 | |
| Sol 86 End-of-Day Ops | -4.766 | 3.595 | 0.282 | |
| Sol 86 End-of-Day Ops | -15.380 | 6.520 | 0.386 | |
| Sol 86 End-of-Day Ops | -16.559 | 2.826 | 0.386 | |
SEQUENCE IMPLEMENTATION REPORT
SCIENCE/TECHNOLOGY OBJECTIVES REPORT