Assumptions:
Assume nominal completion of 50250V with rover egress down rear ramp on SOL2
Rover Activities:
- Abort sequence 50250V (~7:00 LST)
- Read APXS data from night of SOL 2
- APXS soil site image with ADM deployed
- Retract APXS
- IMP image of rover's front left wheel
- Perform abbreviated soil mechanics experiment
- IMP image of rover's front left wheel
- Wait until 12:00 LST to avoid interference with IMP imaging of rock target
- Perform MAE experiment (~12:00 LST)
- Turn in place, partially deploy APXS, move backward to contact with rock
- Capture image with front left camera
- Capture laser calibration images with two lasers active
- Shutdown (~15:00 LST)
- Wake up hourly during night of SOL 3 for health checks and APXS readouts
- Wake up ~07:00 LST on SOL 4
- Await new sequence
Last Updated: 7/6/97