Assumptions:
Assume runout of 50620A on SOL 7,
all rover systems healthy except Y accel.
NOTE: If sequence 50810A is not loaded onto the rover before the
afternoon of SOL 8,
the rover will drop into CONTINGENCY MISSION LOAD. In the rover's
current configuration, this could be hazardous.
50810A Rover Activities:
- Abort sequence 50620A (~07:00)
- Shutdown until ~10:00
- Read APXS (~10:00)
- WEB thermal test (~10:00)
- External thermal test (~10:15)
- Laser image experiment (~10:30)
- Reposition rover, rover movie (~11:15)
- APX predeploy site image (tall rock)
- APX deploy on Yogi (~11:45)
50820A Rover Activities:
- Perform MAE experiments (~12:00)
- APX postdeploy site image (tall rock)
- Shutdown (~12:30)
- Perform MAE experiments (~14:00)
- WEB thermal Test (~14:00)
- External thermal test (~14:15)
- Shutdown (~14:30)
- Wake up hourly overnight of SOL 7 for MAE experiments/health checks and APXS readouts
- Wake up ~07:00 on SOL 8
- Await new sequence
All times LST unless otherwise specified
Last Updated: 7/11/97