Preliminary Rover Plan
Sequence 52510, Sol 25 scenario, 7/28/97

Assumptions:

Assume nominal completion of 52410 on morning of SOL 25, rover systems healthy except for failed right front wheel temperature sensors and continued noise on accels.

Sol 25 plan is to drive to mini-matterhorn, find rock and position for APXS.


52510 Rover Activities:
Time (LST) Activity Telemetry Estimate (Mbits)
08:00 Wakeup
08:00 Morning MAE experiments
09:00 Abort Sequence 52410
09:30 1st & 2nd Waypoint/Rover movie (S0050) 1.0
12:00 MAE
12:00 Find Rock
12:30 Front uncompressed stereo images of mini-matterhorn 3.0 Mbits
14:00 S0055 (4 stereo pair)
15:45 Shutdown, no night ops
Sol 26 08:00 Wakeup, await new sequence (expected ~09:00)
rover telemetry volume ~9.0 Mbits


Last Updated: 7/27/97