Rover Scenario
Sequence 52610, Sol 26 scenario, 7/29/97

Assumptions:

Assume nominal completion of 52520 on morning of SOL 26, rover systems healthy except for failed right front wheel temperature sensors and continued noise on accels.


52610 Rover Activities:
Time (LST) Activity Telemetry Estimate(Mbits)
~07:00 Wakeup
07:30 Abort sequence 52520B
08:00 Morning MAE experiments
09:30 1st waypoint to mini-matterhorn/Rover movie S0050 1.0
10:30 Imaging of mini-matterhorn 3.0
11:00 2nd waypoint, behind spock
11:30 3rd waypoint, near squash
12:00 MAE
12:00 Imaging of squash 3.0
12:30 4th waypoint/positioning for Mermaid Dune
14:10 EOD imaging S0055 (4 stereo pairs) 1.0
15:45 Shutdown, no night ops
total telemetry volume ~9.0 Mbits


Last Updated: 7/29/97