Last updated: 5 August 1997, 10:00 pm PDT
Mission Sequence Planner: MTW
Rover Driver: RW
| SCET | PDT | LST | ||
|---|---|---|---|---|
| Expected uplink time: | 217 17:00:00 | |||
| Nominal sequence activation time: | 217 20:35:00 | Sol 32 10:02 | ||
| Nominal sequence abort time: | 218 21:10:00 | Sol 33 10:07 | (during command [32134]) |
Previous sequence 53010C will nominally be aborted at command [30167]
MISSION SEQUENCE PLANNER REPORT
SEQUENCE DESCRIPTION
| X Position (m) | Y Position (m) | Heading (deg) | |
|---|---|---|---|
| At Sequence Start** | -6.024 | 2.778 | 4.9 |
| At End of Sol 32* (predicted) | -9.260 | 1.073 | 308 |
** Vehicle positions are in surface-fixed frame
* at completion of planned SOL's traverse activities assuming nominal execution
| Image Type | X (m) | Y (m) | Z (m) |
|---|---|---|---|
| S0055 | -18.360 | 1.530 | 0.74 |
| S0055 | -17.526 | 5.663 | 0.74 |
Sol 32 Downlink (by APID)
Predicted telemetry volume generated between activation of sequence 53210B from
nominal start to nominal abort [32134]
Command Range Processed: First Command:[29001] Time Executed: 1249326923 215 19:15:16 10:01:37 Final Command:[29201] Time Executed: 1249497314 217 18:35:13 08:05:30 SUMMARY BY TELEMETRY APID:
| APID | Name | Predicted #Pkts | Predicted #Mbits |
|---|---|---|---|
| 4 | Health Status | 27 | 0.06286 |
| 5 | Ops/Engr | 128 | 0.11267 |
| 6 | Sequence Status | 5 | 0.00142 |
| 7 | Error Reports | 0 | 0.00000 |
| 8 | Science Imaging | 198 | 3.09509 |
| 9 | Technology Imaging | 194 | 3.06670 |
| 10 | Lander Imaging | 0 | 0.00000 |
| 12 | APXS Results | 2 | 0.01710 |
| 23 | Priority Ops/Engr. | 0 | 0.00000 |
| 24 | Auto Imaging | 0 | 0.00000 |
| 25 | Ops Imaging | 116 | 1.76714 |
| 29 | Traverse Reporting | 22 | 0.31437 |
| TOTAL | 692 | 8.43734 |
SEQUENCE IMPLEMENTATION REPORT
Operational Constraints (Sol 32 Sequence): Continue with nominal sequence plan.
Operational Constraints (General):
SCIENCE/TECHNOLOGY OBJECTIVES REPORT
| Image Log # | Status | Command | Image Type | APID | Camera | Exposure | Compression | Rows | Columns |
|---|---|---|---|---|---|---|---|---|---|
| ACCEPTED | [32055] | science | 8 | left | auto | N | 40-215 | 184-724 | |
| ACCEPTED | [32056] | science | 8 | left | auto | N | 205-383 | 184-724 | |
| ACCEPTED | [32057] | science | 8 | right | auto | N | 40-215 | 44-584 | |
| ACCEPTED | [32058] | science | 8 | right | auto | N | 205-383 | 44-584 | |
| ACCEPTED | [32087] | ops | 25 | left | auto | N | 96-375 | 0-768 | |
| ACCEPTED | [32088] | ops | 25 | left | reuse | N | 1-106 | 0-768 | |
| ACCEPTED | [32089] | ops | 25 | left | reuse | N | 365-492 | 0-768 | |
| ACCEPTED | [32092] | ops | 25 | right | auto | N | 96-375 | 0-768 | |
| ACCEPTED | [32093] | ops | 25 | right | reuse | N | 1-106 | 0-768 | |
| ACCEPTED | [32094] | ops | 25 | right | reuse | N | 365-492 | 0-768 | |
| APXS Log # | Status | Time (UTC) | Command # | APXS Command |
|---|---|---|---|---|
| MAE Log # | Status | Time (UTC) | Command # | MAE Command |
|---|---|---|---|---|
| ACCEPTED | 217 22:48:50 | [32066] | Set Parameter: dust_cvr to 800 | |
| ACCEPTED | 217 22:48:54 | [32067] | MAE Experiment | |
| ACCEPTED | 218 19:11:57 | [32118] | Set Parameter: dust_cvr to 10 | |
| ACCEPTED | 218 19:12:01 | [32119] | MAE Experiment | |
| ACCEPTED | 218 19:12:50 | [32121] | MAE Experiment | |
| ACCEPTED | 218 19:13:39 | [32123] | MAE Experiment | |
| WAE Log # | Status | Time (UTC) | Command # | WAE Command |
|---|---|---|---|---|
| Soil Log # | Status | Time (UTC) | Command # | Soil Mechanics Command |
|---|---|---|---|---|
| ACCEPTED | 217 23:57:36 | [32080] | Soil Mechanics (motor:5, counts:500, cycles:6) | |
PRESS RELEASE
TBD
Summary of Planned Rover Activities for Sol X:
| PDT | MLST | Rover Acivity |
|---|---|---|
| 13:35 | 10:02 | Sequence 53210 MARS |
| 13:35 | 10:02 | Begin Daytime Ops Prep |
| 13:37 | 10:04 | Read persistent state table |
| 13:37 | 10:04 | End Daytime Ops Prep |
| 13:37 | 10:04 | Begin set traverse parameters |
| 13:42 | 10:09 | Set laser dropout to 3 |
| 13:43 | 10:10 | End set traverse parameters |
| 13:43 | 10:10 | BEGIN TRAVERSE OPS |
| 13:43 | 10:10 | Wait for S0050 |
| 15:09 | 11:34 | Turn to face squid/hassock for photo |
| 15:13 | 11:37 | Image of hassock/squid |
| 15:48 | 12:12 | End imaging |
| 15:48 | 12:12 | Begin MAE experiment |
| 15:48 | 12:12 | WARNING: Confirm dust cover para |
| 15:49 | 12:13 | End MAE experiment |
| 16:59 | 13:20 | Tech image leading to bookshelf |
| 16:59 | 13:20 | full front 3 strip left mosaic |
| 17:33 | 13:54 | end front mosaic |
| 17:33 | 13:54 | full front 3 strip right mosaic |
| 18:07 | 14:27 | end front mosaic |
| 18:07 | 14:27 | End imaging |
| 18:07 | 14:27 | Begin Night Ops Prep |
| 18:09 | 14:29 | End Night Ops Prep |
| 19:28 | 15:46 | Reset Modem Heat Parms |
| 12:11 | 08:02 | Begin MAE experiment |
| 12:11 | 08:02 | WARNING: Confirm dust cover para |
| 12:14 | 08:05 | End MAE experiment |
| 13:42 | 09:31 | Begin Daytime Ops Prep |
| 13:42 | 09:31 | Read persistent state table |
| 13:42 | 09:31 | End Daytime Ops Prep |
Web Page Author: Matt Wallace
All information on this site, including text and images describing the Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.