STATUS: Completed Report


FLIGHT REPORT

Sol 45
ROVER SEQUENCE PLANNING REPORT


Last updated: 18 August 1997, 14:40 PDT
Mission Sequence Planner: Rick Welch
Rover Driver: Art Thompson




ROVER SEQUENCE ID: 54510D

SCETLST
Nominal sequence activation time:231 04:39Sol 45 09:31
Nominal sequence abort time:233 06:00Sol 47 09:31(during command [45110])

Previous sequence 54310 will nominally be aborted at command [43196]



MISSION SEQUENCE PLANNER REPORT




SEQUENCE DESCRIPTION




SEQUENCE IMPLEMENTATION REPORT


Downlink Report has some interesting stuff:
HAVE S0050 IMAGES TAKEN DURING WAYPOINT COMMANDS ... ESPECIALLY WHEN DRIVING OVER ROUGH TERRAIN! Ideally we (I ... Henry) would like to have seperate S0050 rover movies for each signficant waypoint command and S0055 end-of-day images after each waypoint.

This is not possible as lander imaging sequence is predefined many days before we generate rover sequence and there will be at most 1 S0050 sequence and sometimes none. The uplink team will attempt to make use of whatever predetermined IMP sequence exist at their predefined times to try to capture images of rover during traverse. However if this is critcal for downlink analysis/engineering it is recommended that they work with IMP team and lander team to setup better templates to meet imaging needs.



SCIENCE/TECHNOLOGY OBJECTIVES REPORT