Last updated: 20 August 1997, 10:00 PDT
Mission Sequence Planner: Andrew Mishkin
NO UPLINK PLANNED FOR SOL 46
Due to a scehduled lack of DSN coverage on Sol 46, no uplink or downlink is planned.
As a consequence, no rover driving will take place during this SOL. The traverse to
the rock Shark is scheduled to resume on SOL 47.