Rover Scenario
Sequence 54910, Sol 49 scenario, 8/22/97

Assumptions:

Assume sequence 54710 completed, although we've received almost no downlink in ages... All rover systems healthy except for failed right front wheel temperature sensors and continued noise on accels.

Plan:

Patch risk level 2 articulation hazard limit to effectively disable it.

Snap color shot of lander while we're appropriately poised

Run sans gyro to give odometers their big chance.

Grind Wedge into fine particles of martian debris and move the heck outta there at risk level 10.

Stereo image of Shark, then about face in preparation for the great probing.


LMRE will be powered ON at: 07:38 LST
Queue rover load 54910 at: 09:31 LST
IMP sequence S0050 (movie) at: 10:00 LST
IMP sequence S0053 at: 10:30 LST
IMP sequence S0054 at: 11:00 LST
IMP sequence S0055 at: 14:17 LST
IMP sequence S0056, rover EOD image at: 14:37 LST
LMRE powered OFF at: 14:37 LST
Downlink ends at: 15:07 LST


54910 Rover Activities:
Time (LST) Activity Telemetry Estimate(Mbits)
~07:15 Wakeup
09:31 Abort sequence 54310
09:45 Get off Wedge and move toward Shark
10:23 S0056 used as EOD imaging (8 stereo pairs) 2.0
12:00 MAE experiment
14:00 MAE experiments
15:45 Shutdown
Sol 48 ~07:45 Wakeup, no uplink/downlink today (LMRE off)
Sol 48 12:00 MAE experiment
Sol 48 15:45 Shutdown
Sol 49 ~07:45 Wakeup, await new sequence
total telemetry volume ~2.5 Mbits


Last Updated: 8/22/97