Assume sequence 55410 completed nominally. Rover up on half-dome. All rover systems healthy except for failed right front wheel temperature sensors, continued noise on accels, and a flaky gyro.
Plan:
Attempt to APXS Halfdome
| LMRE will be powered ON at: | 07:38 LST |
| IMP sequence S0050 (movie) at: | 10:00 LST |
| Queue rover load 55510 at: | 12:30 LST |
| IMP sequence S0053 at: | 13:30 LST |
| IMP sequence S0054 at: | 13:58 LST |
| IMP sequence S0055 at: | 14:35 LST |
| LMRE powered OFF at: | 14:51 LST |
| IMP sequence S0056 at: | 15:06 LST |
| Downlink ends at: | 15:22 LST |
55510 Rover Activities:
| Time (LST) | Activity | Telemetry Estimate(Mbits) |
|---|---|---|
| ~07:15 | Wakeup | |
| 12:31 | Abort sequence 55410 | |
| 12:34 | Attemt to put APXS on Halfdome | |
| 12:34 | Conditional: run left rear wheel to drop left bogey. | |
| 12:35 | Conditional "blind man backing" manuever | |
| 13:00 | Rear image of APXS deployed on Halfdome | 1.0 |
| 14:00 | MAE experiment | |
| 14:04 | Begin APXS operations | |
| 15:45 | Shutdown, APX night ops | |
| Sol 56 ~07:45 | Wakeup, await new sequence | |
| total telemetry volume | ~1.3 Mbits |