Last updated: 29 August 1997, 4:30 pm
Mission Sequence Planner: Rick Welch
Rover Driver: Matt Wallace
| SCET | LST | ||
|---|---|---|---|
| Nominal sequence activation time: | 242 13:41 | Sol 56 11:15 | |
| Nominal sequence abort time: | 243 13:03 | Sol 57 10:00 | (during command [6170]) |
Previous sequence 55510 will nominally be aborted at command [5185]
** Vehicle positions are in surface-fixed frame
Sol 56 Downlink (by APID) Predicted telemetry volume generated between activation of sequence 55610B from
nominal start to nominal abort.
See notes to rover team above.
Web Page Author: Rick Welch
All information on this site, including text and images describing the
Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.
MISSION SEQUENCE PLANNER REPORT
Notes to Rover Team:
SEQUENCE DESCRIPTION
X Position (m) Y Position (m) Heading (deg)
At Sequence Start** -4.934 -3.718 73
At End of Sol 56* (predicted) -4.934 -3.718 73
* at completion of planned SOL's traverse activities assuming nominal execution
Image Type X (m) Y (m) Z (m)
S0055 -9.92 -7.58 -0.22
S0055 -9.92 -7.58 -0.22
Request 1 stereo pair for EOD ops imaging -- That's it folks!
SEQUENCE IMPLEMENTATION REPORT
SCIENCE/TECHNOLOGY OBJECTIVES REPORT
Rover Imaging
APXS Experiments
Technology Experiments
Rover
APXS Experiments
Technology Experiments