Last updated: 08/30/97
Mission Sequence Planner: Art Thompson (w/Jack Morrison on remote)
Rover Driver: Art "Don't Call Me Bart Simpson" Thompson
| SCET | LST | ||
|---|---|---|---|
| Nominal sequence activation time: | 243 16:41 | Sol 57 10:04 | |
| Nominal sequence abort time: | 245 16:26 | Sol 59 09:30 | (during command [7261]) |
Previous sequence 55610 will nominally be aborted at command [6175]
** Vehicle positions are in surface-fixed frame
Sol 57 Downlink (by APID) Predicted telemetry volume generated between activation of sequence 55710B from
nominal start to nominal abort.
See notes to rover team above.
Web Page Author: Jack Morrison
All information on this site, including text and images describing the
Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.
MISSION SEQUENCE PLANNER REPORT
Notes to Rover Team:
SEQUENCE DESCRIPTION
X Position (m) Y Position (m) Heading (deg)
At Sequence Start** -4.934 -3.718 73
At End of Sol 57* (predicted) -4.934 -3.718 73
* at completion of planned SOL's traverse activities assuming nominal execution
Image Type X (m) Y (m) Z (m)
S0055 -9.92 -7.58 -0.22
S0055 -9.92 -7.58 -0.22
SEQUENCE IMPLEMENTATION REPORT
SCIENCE/TECHNOLOGY OBJECTIVES REPORT
Rover Imaging
APXS Experiments
Technology Experiments
Rover
APXS Experiments
Technology Experiments