Last updated: 09/04/97
Mission Sequence Planner: MTW
Rover Driver: JM
| SCET | PDT | LST | ||
|---|---|---|---|---|
| Nominal sequence activation time: | 247-18:30 | 11:30 | SOL62/12:38 | |
| Nominal sequence abort time: | 249-18:25 | 11:25 | SOL64/10:50 | (during command [12217]) |
Previous sequence 56010 will nominally be aborted at command 10066
SEQUENCE DESCRIPTION
| X Position (m) | Y Position (m) | Heading (deg) | |
|---|---|---|---|
| At Sequence Start** | -4.942 | -3.876 | 89.07 |
| At End of Sol 60* (predicted) | -4.942 | -3.876 | 89.07 |
| X Position (m) | Y Position (m) | Heading (deg) | |
** Vehicle positions are in lander coordinate frame until
sun-finding establishes surface-fixed frame
* at completion of planned SOL's traverse activities assuming nominal execution
| Image Type | X (m) | Y (m) | Z (m) | Imaging Opportunity |
|---|---|---|---|---|
| End-of-Day Ops | 0.000 | 0.000 | 0.000 | after 185-00:00 |
| Soil Mechanics | 0.000 | 0.000 | 0.000 | after 185-00:00 |
| APXS Site | 0.000 | 0.000 | 0.000 | after 185-00:00 |
Sol 62Downlink (by APID) (Predicted telemetry volume generated between final downlinks on SOL 621 and SOL 62 including end of 56210C and start of 56210C):
| APID | Name | Predicted #Pkts | Predicted #Mbits |
|---|---|---|---|
| 4 | Health Status | ||
| 5 | Ops/Engr | ||
| 6 | Sequence Status | ||
| 7 | Error Reports | ||
| 8 | Science Imaging | ||
| 9 | Technology Imaging | ||
| 10 | Lander Imaging | ||
| 12 | APXS Results | ||
| 23 | Priority Ops/Engr. | ||
| 24 | Auto Imaging | ||
| 25 | Ops Imaging | ||
| 29 | Traverse Reporting | ||
| TOTAL |
SEQUENCE IMPLEMENTATION REPORT
SCIENCE/TECHNOLOGY OBJECTIVES REPORT
| Image Log # | Status | Command | Image Type | APID | Camera | Exposure | Compression | Rows | Columns |
|---|---|---|---|---|---|---|---|---|---|
| APXS Log # | Status | Time (UTC) | Command # | APXS Command |
|---|---|---|---|---|
| MAE Log # | Status | Time (UTC) | Command # | MAE Command |
|---|---|---|---|---|
| WAE Log # | Status | Time (UTC) | Command # | WAE Command |
|---|---|---|---|---|
| Soil Log # | Status | Time (UTC) | Command # | Soil Mechanics Command |
|---|---|---|---|---|
PRESS RELEASE
Since the rover is now running strictly on SOLar power, APXS measurements have to take place during the day. First we will try to read out stored history data from the APXS to recapture some data lost in previous Sols, then we will take new measurements on Half-dome.