Rover Scenario
Sequence 57210, Sol 72 scenario

Assumptions:

Rover sucessfully completed 57110 Sol 71 activities and is in the Sol 72 wait for new load Rover is healthly

Plan:

Sol 72 Activities Time (LST)
LMRE will be powered ON at: 07:38
Queue rover load 57210 at: 10:04
Rover movie, S0050: 10:30
Soil mech image, S0053: N/A
Soil mech image, S0054: N/A
EOD image, S0055: 13:29
Rover tracks image, S0056: N/A
LMRE off: 13:54
Downlink Ends 14:29
Sol 73
LMRE will be powered ON at: 07:38
Queue rover load 57310 at: 10:00
LMRE off: 13:07
Downlink Ends 13:43


Last Updated: 10:15, 15 September 1997 ADT/JCM