Nominal completion of 57210, moving toward chimp
Plan:
Imagimg of chimp and other far off rocks
| Sol 73 Activities | Time (LST) |
|---|---|
| LMRE will be powered ON at: | 07:38 |
| Queue rover load 57310 at: | 10:00 |
| Rover movie, S0050: | 10:30 |
| Soil mech image, S0053: | 10:50 |
| Soil mech image, S0054: | 11:10 |
| EOD image, S0055: | 12:43 |
| Rover tracks image, S0056: | 13:13 |
| LMRE off: | 13:07 |
| Downlink Ends | 13:43 |
| Sol 74 | |
| LMRE will be powered ON at: | 07:38 |
| Queue rover load 56810 at: | 09:31 |
| LMRE off: | 11:53 |
| Downlink Ends | 13:26 |
Sol 73 Rover Activities:
| Time (LST) | Activity | Telemetry Estimate(Mbits) |
|---|---|---|
| ~07:30 | Solar Wakeup | |
| 10:00 | Abort sequence 57210 | |
| 10:05 | Move closer to chimp | |
| 10:10 | Close-up science images of imp | 2.6 |
| 10:45 | Drive behind chimp to get close to swale | |
| 11:30 | Soil Mechanics | |
| 12:00 | MAE experiment | |
| 12:05 | imaging of swale | 3.0 |
| 12:43 | End of day image (as S0055) | 1.5 |
| 14:30 | Shutdown | |
| Sol 74 | ||
| ~07:30 | Solar Wakeup, await new sequence | |
| total telemetry volume | ~8.0 Mbits |