Last updated: 09/21/97
Mission Sequence Planner: JM/AT
Rover Driver: AT/JM
| SCET | LST | ||
|---|---|---|---|
| Nominal sequence activation time: | 265-02:25 | SOL 78/09:31 | |
| Nominal sequence abort time: | 267-03:30 | SOL 80/10:35 | (during command [28220]) |
Previous sequence 57710A will nominally be aborted at command [27132]
MISSION SEQUENCE PLANNER REPORT
SEQUENCE DESCRIPTION
Plan:
Reattempt APXS deployment on Chimp, and measurement thereupon.
| Sol 78 Activities | Time (LST) |
|---|---|
| LMRE will be powered ON at: | 07:38 |
| Queue rover load 57810 at: | 09:31 |
| Rover movie, S0050: | 10:30 |
| Soil mech image, S0053: | 10:50 |
| Soil mech image, S0054: | 11:10 |
| EOD image, S0055: | 11:34 |
| Rover tracks image, S0056: | 12:04 |
| LMRE off: | 11:59 |
| Downlink Ends | 12:34 |
| Sol 79 | |
| LMRE will be powered ON at: | 08:10 |
| Queue rover load 57810 (optional) at: | 10:35 |
| LMRE off: | 11:20 |
| Downlink Ends | 11:55 |
| X Position (m) | Y Position (m) | Heading (deg) | |
|---|---|---|---|
| At Sequence Start** | -9.369 | -2.2 | 24 |
| At End of Sol 78* (predicted) | 0.00 | 0.00 | 65 |
** Vehicle positions are in lander coordinate frame until
sun-finding establishes surface-fixed frame
* at completion of planned SOL's traverse activities assuming nominal execution
| Image Type | X (m) | Y (m) | Z (m) | Imaging Opportunity |
|---|---|---|---|---|
| Movie | between 10:30 and 10:39 | |||
| End-of-Day Ops | -8.786 | -2.192 | .008 | after 10:39 |
SEQUENCE IMPLEMENTATION REPORT
SCIENCE/TECHNOLOGY OBJECTIVES REPORT
Web Page Author: Jack Morrison
All information on this site, including text and images describing the Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.