Loaded Sequence


Contingency Mission Load

PRIMARY PHASE
SOL 86 ROVER SEQUENCE PLANNING REPORT


Last updated: 2 October 1997
Mission Sequence Planner: AHM




CONTINGENCY SEQUENCE TRIGGERED ~12:00 LST ON SOL86:




MISSION SEQUENCE PLANNER REPORT




SEQUENCE DESCRIPTION


  • Vehicle Positions:

    X Position (m)Y Position (m)Heading (deg)
    At Sequence Start** -8.686 -2.103 63
    At Sequence End** -8.686 -2.103 63

    ** Vehicle positions are in surface fixed coordinate frame

  • Telemetry Volume Estimates



    SEQUENCE IMPLEMENTATION REPORT



    Web Page Author: Andrew H. Mishkin

    All information on this site, including text and images describing the Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.