Mission Sequence Planner: Andrew Mishkin
Rover Driver: ---
| SCET | LST | ||
|---|---|---|---|
| Nominal sequence activation time: | SOL 97 | ||
| Nominal sequence abort time: | SOL ?? |
Previous sequence is the Extended Mission contingency sequence. Sequence 59710A will nominally be trigger the Primary Mission contingency sequence.
MISSION SEQUENCE PLANNER REPORT
SEQUENCE DESCRIPTION
Plan:
Put rover back into primary mission contingency to prevent further driving for 6 SOLs.
| X Position (m) | Y Position (m) | Heading (deg) | |
|---|---|---|---|
| At Sequence Start** | ?? | ?? | ?? |
** Vehicle positions are in surface-fixed frame
SEQUENCE IMPLEMENTATION REPORT
SCIENCE/TECHNOLOGY OBJECTIVES REPORT