Data Set Information
DATA_SET_NAME ROSETTA-ORBITER CHECK GIADA 2 CR4A CRUISE4A V1.0
DATA_SET_ID RO-X-GIA-2-CR4A-CRUISE4A-V1.0
NSSDC_DATA_SET_ID
DATA_SET_TERSE_DESCRIPTION
DATA_SET_DESCRIPTION
The format of data reported in GIADA data sets is the same for all mission phases. Data reported by GDS and IS are due to noise as no dust event is expected in this mission phase. MBS frequency changes, once normalised for frequency vs. temperature dependence, if present, are due to deposition of contaminants existing in the S/C environment. Housekeeping and Calibration data from all GIADA sub-systems are useful to evaluate instrument health and behaviour when compared with similar data acquired during other mission phases.
DATA_SET_RELEASE_DATE 2011-11-11T00:00:00.000Z
START_TIME 2008-07-11T04:56:14.683Z
STOP_TIME 2008-07-19T09:13:00.549Z
MISSION_NAME INTERNATIONAL ROSETTA MISSION
MISSION_START_DATE 1995-03-01T12:00:00.000Z
MISSION_STOP_DATE N/A (ongoing)
TARGET_NAME UNKNOWN
TARGET_TYPE UNKNOWN
INSTRUMENT_HOST_ID RO
INSTRUMENT_NAME GRAIN IMPACT ANALYSER AND DUST ACCUMULATOR
INSTRUMENT_ID GIADA
INSTRUMENT_TYPE DUST DETECTOR
NODE_NAME Small Bodies
ARCHIVE_STATUS IN_LIEN_RESOLUTION
CONFIDENCE_LEVEL_NOTE
The data reported in this data set have been converted from ADC counts to engineering values. The quality of the Housekeeping and Calibration data is good. Scientific data are due to noise, as no grain event is expected during this mission phase. These data must be only considered to evaluate GIADA behaviour and not as real scientific data. See RO-GIA-OACUPA-RP-108-1 (reported in DOCUMENTation dir) for evaluations on GIADA behaviour during this mission phase.
CITATION_DESCRIPTION A.Rotundi and the International GIADA Consortium, RO-X-GIA-2-CR4A-CRUISE4A-V1.0, NASA Planetary Data System, 2007.
ABSTRACT_TEXT Payload Checkout 8 (PC8) was an active checkout where a target independent opportunity to perform interactive operations and request spacecraft pointing was given to all Rosetta payload t All Rosetta payload took part in this scenario.The Active Payl Checkout 8 ran for 2 consecutive days (05-06 July2008) plus 26 consecutive days starting on the 9th July 2008 until the 1st A 2008. This is approximately twice the allocated time of the ac PC6 scenario that preceded it. PC8 consists of two pha similar to the previous Passive Payload Checkouts the 2nd phas an active test; GD02 is a Non nominal operational configuratio test (Only Impact Sensor operational and cover closed), in GD0 we have successfully tested a non-standard configuration, in was a test to investigate interference from other instruments. Redundant I/Fs in sequence and executing similar procedures fo two cases. GD02, GD03 and GD_INT were executed only on Main I/ ADC counts to engineering values. The quality of the Housekeeping and Calibration data is good. Scientific data are due to noise, as no grain event is expected during this mission phase. These data must be only considered to evaluate GIADA behaviour and not as real scientific data. Data reported by GDS and IS are due to noise as no dust event is expected during this mission phase. MBS frequency changes, once normalized for frequency vs. temperature dependence, if present, are due to deposition of contaminants existing in the S/C environment. Housekeeping and Calibration data from all GIADA sub-systems are useful to evaluate instrument health and behaviour when compared with similar data acquired during other mission phases.
PRODUCER_FULL_NAME GIADA TEAM
SEARCH/ACCESS DATA
  • SBN Comet Website