Search Results
1–50 of 87 results (0.000 seconds)
-
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - RAW ITS NAV IMAGES V1.0
Raw 9P/Tempel 1 and calibration images acquired by the Deep Impact Impactor Targeting Sensor Visible CCD from 6 May to 4 July 2005 during the encounter phase of the mission for optical and autonomous navigation
DEEP IMPACT - DII-C-ITS-2-NAV-9P-ENCOUNTER-V1.0 - starting 2005-05-06T18:16:42.575Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - RAW HRIV NAV IMAGES V1.0
Raw 9P/Tempel 1 and calibration images acquired by the Deep Impact High Resolution Instrument Visible CCD from 3 June to 4 July 2005 during the encounter phase of the mission for optical and autonomous navigation
DEEP IMPACT - DIF-C-HRIV-2-NAV-9P-ENCOUNTER-V1.0 - starting 2005-06-03T18:03:52.479Z -
data set:
DEEP IMPACT/EPOXI DOCUMENTATION SET V4.0
Version 4.0 of the updated collection of documentation for raw, calibrate, and higher level datasets for the Deep Impact and EPOXI missions.
DEEP IMPACTEPOXI - DI-C-HRII/HRIV/MRI/ITS-6-DOC-SET-V4.0 - starting 2002-06-27T09:53:16Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - REDUCED ITS NAV IMGS V1.0
Calibrated images of comet 9P/Tempel 1 acquired by the Deep Impact Impactor Targeting Sensor Visible CCD on 3-4 July 2005 for optical and autonomous navigation and scientific investigations
DEEP IMPACT - DII-C-ITS-3-NAV-9P-ENCOUNTER-V1.0 - starting 2005-07-03T06:44:32.076Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - REDUCED MRI IMAGES V3.0
Calibrated images of comet 9P/Tempel 1 acquired by the Medium Resolution Instrument Visible CCD from 01 May through 06 July 2005 during the encounter phase of the Deep Impact mission. Version 3.0 was calibrated by the EPOXI mission pipeline.
DEEP IMPACT - DIF-C-MRI-3/4-9P-ENCOUNTER-V3.0 - starting 2005-05-01T20:02:39.051Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - RAW HRII SPECTRA V1.0
Raw 9P/Tempel 1 and science calibration spectra acquired by the Deep Impact High Resolution Instrument Infrared Spectrometer during the 9P encounter phase of the mission.
DEEP IMPACT - DIF-C-HRII-2-9P-ENCOUNTER-V1.0 - starting 2005-05-01T19:58:31.416Z -
data set:
ROSETTA-ORBITER CHECKOUT OSINAC 3 CR2 RDR V2.0
Science images in CODMAC level 3 acquired by the OSIRIS Narrow Angle Camera on the Rosetta spacecraft during the CRUISE 2 mission phase.
INTERNATIONAL ROSETTA MISSION - RO-X-OSINAC-3-CR2-CHECKOUT-V2.0 - starting 2005-04-05T00:00:00Z -
data set:
DEEP IMPACT: IRAS PHOTOMETRY OF COMET 9P/TEMPEL 1
IRAS photometry of the coma of comet 9P/Tempel 1 in support of the NASA Deep Impact Mission
DEEP IMPACTINFRARED ASTRONOMICAL SATELLITE - DI/IRAS-C-FPA-5-9P-PHOT-V1.0 - starting 1983-06-18T00:00:00Z -
data set:
ROSETTA-ORBITER 9P MIRO 3 CR2 9P-TEMPEL1 V1.0
Calibrated data from the Rosetta/MIRO instrument taken during the second cruise phase, consisting primarily of observations of the collision of the Deep Impact mission impactor spacecraft with comet 9P/Tempel 1.
INTERNATIONAL ROSETTA MISSION - RO-C-MIRO-3-CR2-9P-TEMPEL1-V1.0 - starting 2005-06-28T21:14:00Z -
data set:
IMAGES OF COMET 9P/TEMPEL 1 FROM FEBRUARY TO JUNE 2005 V1.0
Images of comet 9P/Tempel 1 from February to June 2005 by Beatrice Mueller
SUPPORT ARCHIVES - EAR-C-I0065/I1084-3-IMGTEMPEL1KPNO-V1.0 - starting 2005-02-01T21:42:27.136Z -
data set:
LOWELL 72-IN IMAGES AND PHOTOM. OF 9P/TEMPEL 1 V1.0
Images and photometry of comet 9P/Tempel 1 obtained by M. Buie using the visual CCD cameras at the Lowell Observatory 72-inch telescope for 11 nights during 2000-09-28 through 2001-01-14.
DEEP IMPACTSUPPORT ARCHIVES - DI/EAR-C-LO72CCD-3-9P-IMAGES-PHOT-V1.0 - starting 2000-09-28T07:11:31Z -
data set:
IMAGES OF 9P/TEMPEL 1 FROM 2005 AROUND THE DI ENCOUNTER V1.0
The data set consists of ground-based images of comet 9P/Tempel 1 in the broadband R and narrowband HB filters taken at the Kitt Peak Mayall 4m telescope with the MOSAIC camera from July 2-9, 2005 around the Deep Impact encounter.
SUPPORT ARCHIVES - EAR-C-I0655-2/3-MOSAICTEMPEL1-V1.0 - starting 2005-07-02T05:39:34Z -
data set:
PLATE SHAPE MODEL OF COMET 9P/TEMPEL 1 V2.0
Detailed plate shape model of comet 9P/Tempel 1
DEEP IMPACT - DIF-C-HRIV/ITS/MRI-5-TEMPEL1-SHAPE-V2.0 - starting 1965-01-01T00:00:00Z -
data set:
KECK I LWS MID-IR IMAGES AND PHOTOMETRY OF 9P/TEMPEL 1
Mid-infrared images and photometry of comet 9P/Tempel 1 from August 21, 2000. Images were obtained by Y.Fernandez et al. with the LWS instrument at the Keck I telescope. This data set is a supplemental archive for Deep Impact.
DEEP IMPACTSUPPORT ARCHIVES - DI/EAR-C-KECK1LWS-3-9P-IMAGES-PHOT-V1.0 - starting 2000-08-21T10:51:19.92Z -
data set:
ROSETTA-ORBITER CHECKOUT OSINAC 4 CR2 RDR-REFLECT V1.0
Science images in CODMAC level 4 acquired by the OSIRIS Narrow Angle Camera on the Rosetta spacecraft during the CRUISE 2 mission phase.
INTERNATIONAL ROSETTA MISSION - RO-X-OSINAC-4-CR2-CHKOUT-REFLECT-V1.0 - starting 2005-04-05T00:00:00Z -
data set:
ROSETTA-ORBITER CHECKOUT OSINAC 4 CR2 RDR-STR-REFL V1.0
Science images in CODMAC level 4 acquired by the OSIRIS Narrow Angle Camera on the Rosetta spacecraft during the CRUISE 2 mission phase.
INTERNATIONAL ROSETTA MISSION - RO-X-OSINAC-4-CR2-CHKOUT-STR-REFL-V1.0 - starting 2005-04-05T00:00:00Z -
data set:
ROSETTA-ORBITER CHECKOUT OSINAC 2 CR2 EDR V2.0
Science and calibration images in CODMAC level 2 acquired by the OSIRIS Narrow Angle Camera on the Rosetta spacecraft during the CRUISE 2 mission phase.
INTERNATIONAL ROSETTA MISSION - RO-X-OSINAC-2-CR2-CHECKOUT-V2.0 - starting 2005-04-05T00:00:00Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - REDUCED ITS IMAGES V1.0
Reduced images of comet 9P/Tempel 1 acquired by the Deep Impact Impactor Target Sensor Visible CCD after the impactor was released from the flyby spacecraft on July 3, 2005 UT.
DEEP IMPACT - DII-C-ITS-3/4-9P-ENCOUNTER-V1.0 - starting 2005-07-03T07:44:30.091Z -
data set:
MCDONALD OBSERVATORY 9P/TEMPEL 1 DATA V1.0
McDonald Obs. observations of 9P/Tempel 1 by A. Cochran
SUPPORT ARCHIVES - EAR-C-LCS-5-9PTMPL1-SPECTRA-V1.0 - starting 1989-07-01T09:43:00Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - REDUCED HRII SPECTRA V1.0
Reduced spectral images of comet 9P/Tempel 1 acquired by the Deep Impact High Resolution Instrument Infrared Spectrometer during the encounter phase of the mission.
DEEP IMPACT - DIF-C-HRII-3/4-9P-ENCOUNTER-V1.0 - starting 2005-06-20T21:08:55.414Z -
data set:
DEEP IMPACT/EPOXI DOCUMENTATION SET V3.0
Version 3.0 of the updated collection of documentation for raw and calibrated science data sets for the Deep Impact and EPOXI missions.
DEEP IMPACTEPOXI - DI-C-HRII/HRIV/MRI/ITS-6-DOC-SET-V3.0 - starting 2002-06-27T09:53:16Z -
data set:
ROSETTA-ORBITER CHECKOUT OSINAC 4 CR2 RDR V1.0
Science images in CODMAC level 4 acquired by the OSIRIS Narrow Angle Camera on the Rosetta spacecraft during the CRUISE 2 mission phase.
INTERNATIONAL ROSETTA MISSION - RO-X-OSINAC-4-CR2-CHECKOUT-V1.0 - starting 2005-04-05T00:00:00Z -
data set:
ROSETTA-ORBITER CHECKOUT OSIWAC 4 CR2 RDR V1.0
Science images in CODMAC level 4 acquired by the OSIRIS Wide Angle Camera on the Rosetta spacecraft during the CRUISE 2 mission phase.
INTERNATIONAL ROSETTA MISSION - RO-X-OSIWAC-4-CR2-CHECKOUT-V1.0 - starting 2005-04-05T00:00:00Z -
data set:
IRTF MID-IR IMAGING OF COMET 9P-TEMPEL 1 V1.0
IRTF Mid-IR Imaging of Comet 9P-Tempel 1
SUPPORT ARCHIVES - DI/EAR-C-I0071-2-IRTF-MIR-TMPL1-V1.0 - starting 2005-07-02T03:17:33Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - RAW ITS NAV IMAGES V1.1
Raw 9P/Tempel 1 and calibration images acquired by the Deep Impact Impactor Targeting Sensor Visible CCD from 6 May to 4 July 2005 during the encounter phase of the mission for optical and autonomous navigation
DEEP IMPACT - DII-C-ITS-2-NAV-9P-ENCOUNTER-V1.1 - starting 2005-05-06T18:16:42.575Z -
data set:
MT. BIGELOW 61-INCH IMAGES OF 9P/TEMPEL 1
Images of 9P/Tempel 1 taken in 1994 with the LPL Visual CCD on the Mt. Bigelow 61-inch Kuiper telescope by Uwe Fink.
DEEP IMPACTSUPPORT ARCHIVES - DI/EAR-C-LPLCCD-3-MTBG61-TMPL1-V1.0 - starting 1994-03-17T06:49:52Z -
data set:
ROSETTA-ORBITER CHECKOUT OSIWAC 4 CR2 RDR-STR-REFL V1.0
Science images in CODMAC level 4 acquired by the OSIRIS Wide Angle Camera on the Rosetta spacecraft during the CRUISE 2 mission phase.
INTERNATIONAL ROSETTA MISSION - RO-X-OSIWAC-4-CR2-CHKOUT-STR-REFL-V1.0 - starting 2005-04-05T00:00:00Z -
data set:
DEEP IMPACT 9P/TEMPEL CRUISE - RAW MRI NAV IMAGES V1.0
Raw calibration and test images acquired by the Deep Impact Medium Resolution Instrument Visible CCD from 14 January to 25 April 2005 during cruise for optical and autonomous navigation
DEEP IMPACT - DIF-CAL-MRI-2-NAV-9P-CRUISE-V1.0 - starting 2005-01-14T23:53:52.85Z -
data set:
STARDUST SPICE KERNELS V1.0
Navigation and ancillary data in the form of SPICE System kernel files for the Stardust spacecraft.
NEXTSTARDUST - SDU-C-SPICE-6-V1.0 - starting 1999-02-07T00:00:00Z -
data set:
DEEP IMPACT INSTRUMENT MOVIES OF 9P/TEMPEL 1, V1.0
Movies created by combining images from the HRI/Vis, ITS and MRI instruments flown on the Deep Impact flybay and impactor crafts.
DEEP IMPACT - DI-C-HRIV/ITS/MRI-5-MOVIE-COLL-V1.0 - starting 2005-01-12T00:00:00Z -
data set:
STARDUST 9P/TEMPEL 1 NAVCAM 3 NEXT V1.0
RDR images taken by STARDUST Navigation Camera (NAVCAM) before, during and after the comet 9P/Tempel 1 (1867 G1) encounter.
NEXT - SDU-C/CAL-NAVCAM-3-NEXT-TEMPEL1-V1.0 - starting 2007-01-25T00:00:00Z -
data set:
NEAR-INFRARED IMAGES OF COMET 9P/TEMPEL 1 V1.0
Near-infrared images of comet 9P/Tempel 1 from UT July 2-9, 2005. The images were obtained by M. Knight et al. using SQIID on the KPNO 2.1-m telescope.
DEEP IMPACTSUPPORT ARCHIVES - DI/EAR-C-SQIID-3-9PNIRIMAGES-V1.0 - starting 2005-07-02T04:58:04Z -
data set:
ROSETTA-ORBITER CRUISE 2 OSIWAC 2 EDR
V1.4
Science and calibration images acquired by the OSIRIS Wide Angle Camera on the rosetta spacecraft during the CRUISE 2 mission phase
INTERNATIONAL ROSETTA MISSION - RO-X-OSIWAC-2-CR2-CRUISE2-V1.4 - starting 2005-04-05T00:00:00Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - REDUCED HRII SPECTRA V2.0
Calibrated spectral images (version 2.0) of comet 9P/Tempel 1 acquired by the Deep Impact High Resolution Instrument Infrared Spectrometer from 20 June through 6 July 2005 during the encounter phase of the mission
DEEP IMPACT - DIF-C-HRII-3/4-9P-ENCOUNTER-V2.0 - starting 2005-06-20T21:08:55.414Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - REDUCED HRIV IMAGES V1.0
Reduced images of comet 9P/Tempel 1 acquired by the Deep Impact High Resolution Instrument Visible CCD during the encounter phase of the mission.
DEEP IMPACT - DIF-C-HRIV-3/4-9P-ENCOUNTER-V1.0 - starting 2005-05-01T20:02:39.996Z -
data set:
DEEP IMPACT DOCUMENTATION SET V1.0
Documentation for raw and reduced data sets from the cruise and encounter phases of the Deep Impact mission; Documentation for the thermal-vacuum data sets is included
DEEP IMPACT - DI-C-HRII/HRIV/MRI/ITS-6-DOC-SET-V1.0 - starting 2002-06-27T09:53:16Z -
data set:
ROSETTA-ORBITER CRUISE 2 OSIWAC 3 RDR
V1.4
Science and calibration images acquired by the OSIRIS Wide Angle Camera on the rosetta spacecraft during the CRUISE 2 mission phase
INTERNATIONAL ROSETTA MISSION - RO-X-OSIWAC-3-CR2-CRUISE2-V1.4 - starting 2005-04-05T00:00:00Z -
data set:
DEEP IMPACT/EPOXI DOCUMENTATION SET V2.0
Documentation collection for raw and calibrated data sets from the Deep Impact and EPOXI missions.
DEEP IMPACTEPOXI - DI-C-HRII/HRIV/MRI/ITS-6-DOC-SET-V2.0 - starting 2002-06-27T09:53:16Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - RAW MRI DATA V1.0
Raw 9P/Tempel 1 and science calibration images acquired by the Deep Impact Medium Resolution Instrument Visibe CCD during the 9P encounter phase of the mission.
DEEP IMPACT - DIF-C-MRI-2-9P-ENCOUNTER-V1.0 - starting 2005-05-01T20:02:39.004Z -
data set:
DEEP IMPACT MRI PHOTOMETRY OF COMET 9P/TEMPEL 1 V1.0
Approach photometry of comet 9P/Tempel 1 derived from images acquired by the Deep Impact Medium Resolution CCD Instrument from 1 May 2005 to 4 July 2005.
DEEP IMPACT - DIF-C-MRI-5-TEMPEL1-PHOTOMETRY-V1.0 - starting 2005-05-01T20:05:07.337Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - REDUCED HRIV IMAGES V3.0
Calibrated images of comet 9P/Tempel 1 acquired by the High Resolution Instrument Visible CCD from 01 May through 04 July 2005 during the encounter phase of the Deep Impact mission. Version 3.0 was calibrated by the EPOXI mission pipeline.
DEEP IMPACT - DIF-C-HRIV-3/4-9P-ENCOUNTER-V3.0 - starting 2005-05-01T20:02:40.039Z -
data set:
DEEP IMPACT 9P/TEMPEL CRUISE - RAW HRIV NAV IMAGES V1.0
Raw calibration and test images acquired by the Deep Impact High Resolution Instrument Visible CCD from 14 January to 25 April 2005 during cruise for optical and autonomous navigation
DEEP IMPACT - DIF-CAL-HRIV-2-NAV-9P-CRUISE-V1.0 - starting 2005-01-14T23:53:53.85Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - REDUCED HRII SPECTRA V3.0
Calibrated 1.05- to 4.8-micron spectral images of comet 9P/Tempel 1 acquired by the High Res. Infrared Spectrometer from 20 June through 6 July 2005 during the encounter phase of the Deep Impact mission. V3.0 was calibrated by the EPOXI mission pipeline.
DEEP IMPACT - DIF-C-HRII-3/4-9P-ENCOUNTER-V3.0 - starting 2005-06-20T21:08:55.422Z -
data set:
ROSETTA-ORBITER CRUISE 2 OSINAC 3 RDR
V1.4
Science and calibration images acquired by the OSIRIS Narrow Angle Camera on the rosetta spacecraft during the CRUISE 2 mission phase
INTERNATIONAL ROSETTA MISSION - RO-X-OSINAC-3-CR2-CRUISE2-V1.4 - starting 2005-04-05T00:00:00Z -
data set:
STARDUST 9P/TEMPEL 1 NAVCAM 2 NEXT V1.0
EDR images taken by STARDUST Navigation Camera (NAVCAM) before, during and after the comet 9P/Tempel 1 (1867 G1) encounter.
NEXT - SDU-C/CAL-NAVCAM-2-NEXT-TEMPEL1-V1.0 - starting 2007-01-25T00:00:00Z -
data set:
ROSETTA-ORBITER 9P MIRO 3 CR2 9P-TEMPEL1 V1.1
Calibrated data from the Rosetta/MIRO instrument taken during the second cruise phase, consisting primarily of observations of the collision of the Deep Impact mission impactor spacecraft with comet 9P/Tempel 1.
INTERNATIONAL ROSETTA MISSION - RO-C-MIRO-3-CR2-9P-TEMPEL1-V1.1 - starting 2005-06-28T21:14:00Z -
data set:
ROSETTA-ORBITER CHECKOUT OSIWAC 3 CR2 RDR V2.0
Science images in CODMAC level 3 acquired by the OSIRIS Wide Angle Camera on the Rosetta spacecraft during the CRUISE 2 mission phase.
INTERNATIONAL ROSETTA MISSION - RO-X-OSIWAC-3-CR2-CHECKOUT-V2.0 - starting 2005-04-05T00:00:00Z -
data set:
ROSETTA-ORBITER 9P/CAL/CHECK ALICE 2 CR2 V1.0
Contains raw instrument checkout data from the Rosetta Orbiter ALICE instrument during the Cruise 2 mission phase
INTERNATIONAL ROSETTA MISSION - RO-C/CAL/X-ALICE-2-CR2-V1.0 - starting 2005-06-27T18:48:06.415Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - REDUCED MRI IMAGES V2.0
Calibrated images (version 2.0) of comet 9P/Tempel 1 acquired by the Deep Impact Medium Resolution Instrument Visible CCD from 1 May through 5 July 2005 during the encounter phase of the mission.
DEEP IMPACT - DIF-C-MRI-3/4-9P-ENCOUNTER-V2.0 - starting 2005-05-01T20:02:39.004Z -
data set:
DEEP IMPACT 9P/TEMPEL ENCOUNTER - REDUCED MRI NAV IMGS V1.1
Calibrated images of comet 9P/Tempel 1 acquired by the Deep Impact Medium Resolution Instrument Visible CCD from 15 May to 4 July 2005 for optical and autonomous navigation and scientific investigations
DEEP IMPACT - DIF-C-MRI-3-NAV-9P-ENCOUNTER-V1.1 - starting 2005-05-15T05:10:37.906Z
Data Sets and Information
Result pages: 1 2