STATUS: Completed Report


FLIGHT REPORT

Sol 47
ROVER SEQUENCE PLANNING REPORT


Last updated: 20 August 1997, 14:40 PDT
Mission Sequence Planner: Andrew Mishkin
Rover Driver: Jack Morrison




ROVER SEQUENCE ID: 54710B

SCETLST
Nominal sequence activation time:233 05:54Sol 47 09:31
Nominal sequence abort time:235 07:12Sol 49 09:31(during command [45145])

Previous sequence 54510 will nominally be aborted at command [45221]



MISSION SEQUENCE PLANNER REPORT




SEQUENCE DESCRIPTION




SEQUENCE IMPLEMENTATION REPORT


Downlink Report has some interesting stuff:
HAVE S0050 IMAGES TAKEN DURING WAYPOINT COMMANDS ... ESPECIALLY WHEN DRIVING OVER ROUGH TERRAIN! Ideally we (I ... Henry) would like to have seperate S0050 rover movies for each signficant waypoint command and S0055 end-of-day images after each waypoint.

This is not possible as lander imaging sequence is predefined many days before we generate rover sequence and there will be at most 1 S0050 sequence and sometimes none. The uplink team will attempt to make use of whatever predetermined IMP sequence exist at their predefined times to try to capture images of rover during traverse. However if this is critcal for downlink analysis/engineering it is recommended that they work with IMP team and lander team to setup better templates to meet imaging needs.



SCIENCE/TECHNOLOGY OBJECTIVES REPORT





PRESS RELEASE


Web Page Author: Andrew Mishkin

All information on this site, including text and images describing the Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.