Last updated: 09/22/97
Mission Sequence Planner: Andy Mishkin
Rover Driver: Art Thompson
| SCET | LST | ||
|---|---|---|---|
| Nominal sequence activation time: | 266-04:11 | SOL79-10:35 | |
| Nominal sequence abort time: | 268-04:40 | SOL81-09:42 | (during command [29230]) |
Previous sequence 57910B will nominally be aborted at command [28140]
MISSION SEQUENCE PLANNER REPORT
SEQUENCE DESCRIPTION
Plan:
| Sol 79 Activities | Time (LST) |
|---|---|
| LMRE will be powered ON at: | 08:10 |
| Queue rover load 57910 at: | 10:35 |
| Rover movie, S0050: | 10:30 (NA) |
| Soil mech image, S0053: | 10:50 (NA) |
| Soil mech image, S0054: | 11:10 (NA) |
| EOD image, S0055: | 10:55 |
| Rover tracks image, S0056: | 11:25 |
| LMRE off: | 11:20 |
| Downlink Ends | 11:55 |
| Sol 80 | |
| LMRE will be powered ON at: | 08:10 |
| Queue rover load 58010 at: | 10:35 |
| LMRE off: | 10:41 |
| Downlink Ends | 11:16 |
| X Position (m) | Y Position (m) | Heading (deg) | |
|---|---|---|---|
| At Sequence Start** | -8.865 | -2.108 | 65.1 |
| At End of Sol 79* (predicted) | similar | similar | 65 |
** Vehicle positions are in surface-fixed frame
* at completion of planned SOL's traverse activities assuming nominal execution
| Image Type | X (m) | Y (m) | Z (m) | Imaging Opportunity |
|---|---|---|---|---|
| End-of-Day Ops (S0056) | -8.786 | -2.192 | .008 | 11:25 |
SEQUENCE IMPLEMENTATION REPORT
SCIENCE/TECHNOLOGY OBJECTIVES REPORT