Last updated: 29 July 1997, 10:00 pm PDT
Mission Sequence Planner: RW/AHM
Rover Driver: JM/BC
| SCET | PDT | LST | ||
|---|---|---|---|---|
| Expected uplink time: | ||||
| Nominal sequence activation time: | 211 13:32:00 | 07:00 | ||
| Nominal sequence abort time: | 212 17:15:00 | Sol 27 10:00 | (during command [26164]) |
Previous sequence 52520B will nominally be aborted at command [25652]
MISSION SEQUENCE PLANNER REPORT
SEQUENCE DESCRIPTION
| X Position (m) | Y Position (m) | Heading (deg) | |
|---|---|---|---|
| At Sequence Start** | 0.542 | 3.750 | 270.0 |
| At End of Sol 26* (predicted) | -3.890 | 2.263 | 335.0 |
** Vehicle positions are in surface-fixed frame
* at completion of planned SOL's traverse activities assuming nominal execution
| Image Type | X (m) | Y (m) | Z (m) |
|---|---|---|---|
| S0055 | -3.70 | 2.05 | 0.43 |
| S0055 | -3.13 | 2.87 | 0.43 |
| S0055 | -6.53 | 2.78 | 0.43 |
| S0055 | -5.71 | 4.22 | 0.43 |
Sol 26 Downlink (by APID)
Predicted telemetry volume generated between activation of sequence 52610B from
nominal start to nominal abort [26164]
Command Range Processed: First Command:[26001] Time Executed: 1248960727 211 13:32:00 07:01:38 Final Command:[26165] Time Executed: 1249067970 212 19:19:23 12:01:11 SUMMARY BY TELEMETRY APID:
| APID | Name | Predicted #Pkts | Predicted #Mbits |
|---|---|---|---|
| 4 | Health Status | 31 | 0.07217 |
| 5 | Ops/Engr | 88 | 0.03137 |
| 6 | Sequence Status | 3 | 0.00094 |
| 7 | Error Reports | 0 | 0.00000 |
| 8 | Science Imaging | 0 | 0.00000 |
| 9 | Technology Imaging | 0 | 0.00000 |
| 10 | Lander Imaging | 0 | 0.00000 |
| 12 | APXS Results | 0 | 0.00000 |
| 23 | Priority Ops/Engr. | 0 | 0.00000 |
| 24 | Auto Imaging | 0 | 0.00000 |
| 25 | Ops Imaging | 402 | 6.26928 |
| 29 | Traverse Reporting | 20 | 0.27279 |
| TOTAL | 544 | 6.64655 |
SEQUENCE IMPLEMENTATION REPORT
No Report Found!
SCIENCE/TECHNOLOGY OBJECTIVES REPORT
| Image Log # | Status | Command | Image Type | APID | Camera | Exposure | Compression | Rows | Columns |
|---|---|---|---|---|---|---|---|---|---|
| ACCEPTED | [26072] | ops | 25 | left | auto | N | 40-220 | 184-724 | |
| ACCEPTED | [26073] | ops | 25 | left | auto | N | 205-383 | 184-724 | |
| ACCEPTED | [26074] | ops | 25 | right | auto | N | 40-220 | 44-584 | |
| ACCEPTED | [26075] | ops | 25 | right | auto | N | 205-383 | 44-584 | |
| ACCEPTED | [26107] | ops | 25 | left | auto | N | 83-259 | 184-724 | |
| ACCEPTED | [26108] | ops | 25 | left | auto | N | 245-426 | 184-724 | |
| ACCEPTED | [26109] | ops | 25 | right | auto | N | 83-259 | 44-584 | |
| ACCEPTED | [26110] | ops | 25 | right | auto | N | 245-426 | 44-584 | |
| APXS Log # | Status | Time (UTC) | Command # | APXS Command |
|---|---|---|---|---|
| MAE Log # | Status | Time (UTC) | Command # | MAE Command |
|---|---|---|---|---|
| ACCEPTED | 211 14:33:49 | [26008] | Set Parameter: dust_cvr to 10 | |
| ACCEPTED | 211 14:33:53 | [26009] | MAE Experiment | |
| ACCEPTED | 211 14:34:42 | [26011] | MAE Experiment | |
| ACCEPTED | 211 14:35:31 | [26013] | MAE Experiment | |
| ACCEPTED | 211 18:39:52 | [26100] | Set Parameter: dust_cvr to 800 | |
| ACCEPTED | 211 18:39:56 | [26101] | MAE Experiment | |
| ACCEPTED | 212 15:13:17 | [26147] | Set Parameter: dust_cvr to 10 | |
| ACCEPTED | 212 15:13:21 | [26148] | MAE Experiment | |
| ACCEPTED | 212 15:14:10 | [26150] | MAE Experiment | |
| ACCEPTED | 212 15:14:59 | [26152] | MAE Experiment | |
| WAE Log # | Status | Time (UTC) | Command # | WAE Command |
|---|---|---|---|---|
| Soil Log # | Status | Time (UTC) | Command # | Soil Mechanics Command |
|---|---|---|---|---|
PRESS RELEASE
Drive somemore
Summary of Planned Rover Activities for Sol 27:
| PDT | MLST | Rover Acivity |
|---|---|---|
| 06:32 | 07:01 | Sequence 52610 MARS |
| 07:33 | 08:01 | Begin MAE experiment |
| 09:05 | 09:31 | 1st waypoint |
| 09:52 | 10:16 | Imaging of mini-matterhorn |
| 10:33 | 10:56 | 2nd waypoint |
| 11:06 | 11:29 | 3rd waypoint |
| 11:39 | 12:01 | Begin MAE experiment |
| 11:40 | 12:02 | Imaging of squash |
| 12:16 | 12:37 | 4th waypoint |
| 13:44 | 14:02 | End Night Ops Prep |
| 08:13 | 08:01 | Begin MAE experiment |
| 12:19 | 12:01 | End Nominal Sequence |
Web Page Author: Rick Welch
All information on this site, including text and images describing the Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.